ADR-0035: Test Strategy — Extend, Not Rebuild

  • Date: 2026-06-10
  • Status: superseded
  • Superseded by: ADR-0058
  • Deciders: Construct maintainers (cx-architect, cx-qa)
  • Supersedes: none

Problem

Bugs have shipped from Construct that the test suite did not catch, and the suite is large enough (~300 test files, tens of thousands of lines) that the cost of maintaining it is real. The decision- forcing question is whether the suite's architecture is wrong — in which case continuing to invest in it is throwing good effort after bad — or whether the architecture is sound and the escapes trace to a different cause that a rebuild would not fix. Choosing wrong is expensive in both directions: rebuilding a sound suite destroys working regression coverage, while extending a broken one keeps shipping bugs.

Context

An escape analysis (docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md) mined 18 shipped-and-fixed bugs from git history, CHANGELOG, and the issue tracker, and classified each by the test layer that should have caught it. The distribution:

  • 67% (12/18) were catchable by a layer that already exists — the test was missing or wrong. [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md]
  • 22% (4/18) needed the host-emulation layer, which is already roughly 60% built [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] (tests/functional/host-mcp-emulation.functional.test.mjs, tests/e2e/local-model-ab.mjs, tests/helpers/ollama-record-proxy.mjs, and the in-flight epic for it).
  • 11% (2/18) genuinely require a live model or binary (live-e2e). [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md]

The suite is integration-weighted (about 65% of files spawn a real binary or import a real lib/ [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] module; about 22% touch mocks), and the mocks that exist are faithful failure injectors (for example [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] the docling stub exits non-zero to mirror the real provisioning hang). The single most telling fact: the same fire-and-forget async-write defect shipped twice, six months apart, in two different files — and that exact class of bug is the functional suite's own canonical example in tests/functional/README.md. The suite re-shipped a bug its own documentation names.

Decision

Extend the existing test architecture; do not rebuild it. Specifically:

  1. Finish the live-host-session layer. Complete the host-emulation suite so a real OpenCode (and Claude) session can be driven end-to-end against Construct, with retry-and-skip semantics for the known headless opencode run --format json intermittency (empty output is recorded as a FLAKY-SKIP, not a pass and not a hard failure, so the flakiness stays observable).
  2. Add value telemetry where only latency exists. Hooks carry @p95ms budgets but no record of how often each fires, blocks, or mutates; rules have no retrieval telemetry at all. Instrument both so future consolidation decisions rest on data, not guesses.
  3. Close the discipline gap, not just individual bugs. When a fix lands for a bug class the suite's own docs already name (async write durability, cross-process visibility), the regression test is mandatory and the class is added to a checklist the functional README enforces, so a named class cannot silently re-ship.

Rationale

The escape distribution is the decision driver. Two-thirds of escapes were catchable by layers that already exist, which means the foundation is not the failure — coverage discipline is. A rebuild addresses the architecture, so it cannot fix a discipline problem; it would instead delete the 65% of [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] integration-weighted tests that are doing real work and reset the regression corpus to zero. The 22% [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] that needed a new layer point not at a rebuild but at finishing a layer that is already most of the way there, which is additive. The twice-shipped, self-named bug class is direct evidence that the missing ingredient is enforcement of the discipline the suite already documents, not a new suite.

Rejected alternatives

  • Rebuild the suite from scratch. Rejected: it would destroy working integration-weighted regression coverage to fix a problem (discipline) that a rebuild does not address; only 11% of [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] escapes were genuinely hard to test, so there is no architectural defect large enough to justify the loss. The strongest version of this case — survivorship bias, and the suite's blindness to the live-model collapse that motivated the audit — is real but is answered by adding the live-host layer, not by discarding the rest.
  • Keep the suite unchanged. Rejected: the host-emulation gap is real (22% of escapes), and the [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] absence of hook/rule value telemetry means consolidation decisions would stay guesswork. Doing nothing leaves both the live-model blind spot and the discipline gap open.
  • Restructure aggressively (re-tier most tests). Rejected on the evidence: it would be warranted only if most escapes needed a non-existent layer or most files were happy-path mocks; the measured numbers (22% and 22% respectively) are well below the thresholds that would justify it. [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md]

Consequences

  • The live-host-session layer becomes the priority test investment; once finished it covers the maintainer's top pain (local-model coherence in a real host) and the 22% of escapes that needed it. [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md]
  • Hooks and rules gain value telemetry, unblocking the proliferation-driven consolidation in later work without guessing.
  • A named-bug-class checklist adds a small, enforced discipline step to fixes; the cost is a slightly heavier fix workflow, paid to stop re-shipping known classes.
  • The existing unit + functional + e2e layering is affirmed, so contributors keep writing tests in the established shape.

Reversibility

Two-way door. Every change here is additive (a new layer, new telemetry, a checklist); none rewrites or deletes existing tests. If the live-host layer proves too flaky to be worth it, it can be quarantined to opt-in e2e without affecting the rest. Falsified-if a re-classification of escapes finds more than half needed a layer that does not exist, or more than 60% of files prove to be happy-path mocks — either [source: docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md] would flip the verdict toward restructure and should trigger a revisit.

References

  • docs/notes/research/2026-06-construct-audit/70-test-infra-verdict.md (escape table and distribution)
  • docs/notes/research/2026-06-construct-audit/80-synthesis.md (item 1)
  • tests/functional/README.md (the canonical async-write example and the suite philosophy)
  • ADR-0029 (per-hook performance budgets — the latency-only baseline this extends)